In the NetZero dream, Scope 1 and 2 is an easy fix in The Presentation. More power in than out. Self-reliance and islanding. Generate all your energy on site with solar or similar and bring nothing in from the grid. If you can sell your excess to the grid, even better.
Sure it’s expensive but have you ever looked at a £750pcm standing charge for gas on your energy bill? Or the cost of heating a 4,750sqm building like we’re all Alice Parker in the 1900’s?
Where infrastructure allows, gas is out and the future is my solar punk ideal of brutalist structures and entirely self-sufficient commercial infrastructure which feeds oversupply back to the grid is on the table. My dream is every commercial entity being a generating island that feeds its excess back to a grid that can take it but actioning it is not quite such a straight line.
Much like the AC power we’ve converting our sunlight into, getting the go ahead to action a 60kW addition to an existing system, at the “wrong side” of your building is full of ups and downs. You’re covering; ground works, road works and fire stopping before you even start on the wizardry of harnessing the sun to power your ceiling lights.
It’s being handed a jigsaw that, with closer inspection, is 7 different jigsaws stored in the same box but the lid definitely just says “60kW Solar Farm – Bolts Straight On.”
I could easily write fifteen pages of detailed and niche notes and anecdotes but it boils down to; our project was on the wrong side of site to make this job easy, too far to make it cheap and the site was just complex enough to mean I did a lot of walking around, pointing and things and going back to the drawing board with the experts because doing this, you have to do it right, there is no alternative or your house burns down. None of that is helped by the fact that any project that I am lucky enough to get invited onto gets futureproofing snuck in on my additions. Building the future without allowing for future expansion? Not on my watch; check your supply list and find the extra ductwork, manholes and cable trays I snuck in so our 2033 expansion is already part paid for and trenched, so we’re not paying people to do the same job twice.
As you well know, Pouillet’s Law says you can’t just sling a cable from A to B. It’s big maths. The kind of big maths you pay people to do on your behalf, and we had a handful of routes we wanted our power to take but we were just the wrong side of the site. We couldn’t take the straight route as we had a very nice block paving path that would never go back in once disturbed. We couldn’t go around the back of the building because Pouillet kindly tells you how to work out what cable you need for the long road and the cheapest supplier informs you it’s a million quid (approx, they actually didn’t bother to quote because the cost was prohibitive.)
So, using professionals and experts of a variety of different fields – you go through.
For this blog, I’ll make it sound like we got from A – B easy enough but it was a whole selection of complexity but basically we got power from the field and into the building.
Perfect – power was flowing but how do you know the pay off is worth it?
Stage 2 (or 127, depends where you’re reading this from) but the flow of electrons was just the beginning – the Egni dream is to have this data logged and viewable for anyone.
I can see there’s power, I have some very nice instruments that tell me so, they even log it but not everybody wants to get their big boots on to stomp through the long grass to the inverters and take notes. So it’s a dashboard you want but how do you get your data? Where is it coming from and how will it be conveyed to a person who doesn’t wear trousers with 14 pockets and whose only interest in the entire project is that when they turn the plug on, it comes on?
Dashboards are the step from complex to consumable, from finite detail to finance details. I may need each feed broken down to its individual supply (so I can see what each bank is doing and if it’s misbehaving) but whoever is at the end of our bill run does not care that strings A-E are working at a slightly different pace to F-L – they just need to know how much power we’ve generated and saved so it can be converted into cash money for an infographic which will look very nice on a Canva presentation and convince others to let us do it again.
You get this data through sensors. Some inverters supply their own dashboards, some play well with others. Ours do not to and so we have an entire project at M-SParc solely dedicated to capturing as much data as we can, dragging it into a spreadsheet and making it look pretty. Unsurprisingly it’s complex, involves a lot of legwork and data plotting tools but it’s interesting and if you’re in the market for a “Smart Building” it is completely necessary.
12 months in and we are almost there. Every day, the sun rises and the radiation whipped across the cosmos hits our new array and thanks to those in STEM, we’re suddenly pulling enough power to boil kettles, put the lights on, power the servers and computers of those indoors without touching what the National Grid is putting out. Give us enough sun and we’ll keep the entire building fed and push the excess out to those at home.
Thanks to the work of those in Data and Comms, we’ll track it too. A few clicks of the mouse, which I’ve just done, and I can tell you with MID-billable certainty that we’re pulling in 26kW on an overcast Autumnal day and that’s from one array. There’s 4 more doing the same thing and we can see it all. We can track it all and we are working on making a dashboard everybody can understand without perceiving all the mountains of data behind the scenes.
No matter your scale or what you’re starting with – if your goal is to be self sufficient or even just take the edge off your utility bills – it can be done as simply or as complexly as you want and it’s never just a pipe dream. You just need the right support from those whose entire wardrobe is hard wearing and soon you too will be presenting the “A to B of delivering our solar array” presentation. 6 slides, no notes.
Stephen Linton, Facilities & Operations Officer
tom@m-sparc.com
Tom used to work at the KFC in his hometown of Colwyn Bay before it mysteriously burned down. He then spent several years “on the lam” in East Germany, where he worked as an animator in Berlin. When the wall fell, Tom came home.
He enjoys climbing and hates ice-skating.